Horse Creek Bridge (Murdo, SD)
- Architect: South Dakota Department of Transportation
- Division Manager: Dave Daily
- Project Manager: Jason Bransted
- Superintendent: Zack Grenstinel
- Owner: South Dakota Department of Transporation / Sub Through Zandstra
- Size: $1,802,236.67 /165' Continuous Concrete Bridge
- Subcontractors: Leska (DBA Bib Foundation) - Drilled Shaft Excavation
- Self Work: Foundation concrete and steel piling. Concrete bridge deck and barrier rail, concrete approach slabs.
|
Work included the replacement of a 165' continuous concrete bridge. The foundation of the bridge to include 9 - 36" Diameter drilled shafts and 41 12x53 steel pilings @ 40' length.
All field work to be completed by 11/1/2019.