Horse Creek Bridge (Murdo, SD)

  • Architect: South Dakota Department of Transportation
  • Division Manager: Dave Daily
  • Project Manager: Jason Bransted
  • Superintendent: Zack Grenstinel
  • Owner: South Dakota Department of Transporation / Sub Through Zandstra
  • Size: $1,802,236.67 /165' Continuous Concrete Bridge
  • Subcontractors: Leska (DBA Bib Foundation) - Drilled Shaft Excavation
  • Self Work: Foundation concrete and steel piling. Concrete bridge deck and barrier rail, concrete approach slabs.

Work included the replacement of a 165' continuous concrete bridge. The foundation of the bridge to include 9 - 36" Diameter drilled shafts and 41 12x53 steel pilings @ 40' length.

All field work to be completed by 11/1/2019.